次目则1总(1)语2术(2)(5 )3基本规定(5)3.1施工技术准备(5 )3.2质量管理(6)施工质量验收的划分3.3(6)3.4检验数量(7)3.5验收方法和质量合格标准4仪表设备和材料的检验及保管(10)(10)仪表设备和材料的检验及保管·4.1(11)4.2质量验收(13)5取源部件安装(13)5.1一般规定(13)5.2温度取源部件(14)压力取源部件5.3(14)流量取源部件5.4(16)物位取源部件5. 5(17)5.6分析取源部件(17)5.7质量验收(22)6仪表设备安装(22)6.1一般规定(23)6.2仪表盘、柜、箱(25)6.3温度检测仪表(25)压力检测仪表6.4.1
6.5(25)流量检测仪表6.6(28)物位检测仪表·(29)6.7机械量检测仪表.6.8(30)成分分析和物性检测仪表(30)6.9其他检测仪表(30)6.10执行器6.11(31)控制仪表和综合控制系统6.12仪表电源设备(31)6.13(33)质量验收7仪表线路安装(40)7. 1(40)一般规定7.2(41)支架制作与安装..7. 3电缆桥架安装(42)7. 4电缆导管安装(43)7.5电缆、电线及光缆敷设(44)7.6仪表线路配线(46)7.7质量验收(47)8仪表管道安装(52)8. 1一般规定(52)8. 2测量管道(53)8.3气动信号管道(54)8.4气源管道(54)8.5液压管道(55)8.6盘、柜、箱内仪表管道(56)8.7管道试验(56)8.8质量验收(58)9脱脂(65)9.1般规定(65)9.2脱脂方法(66):2
(66)9.3脱脂件检查(67)9.4质量验收(68)10电气防爆和接地(68)10.1爆炸和火灾危险环境的仪表装置施工(70)接地·10.2(71)10.3质量验收护(75)防11(75)11.1隔离与吹洗(75)11.2防腐、绝热(76)11.3伴热(77)11.4质量验收(79)12仪表试验(79)一般规定12.1-(80)单台仪表校准和试验12.2(82)仪表电源设备试验12.3(82)综合控制系统试验12.4(84)回路试验和系统试验·12.5(85)12.6质量验收(91)13工程交接验收.(91)交接验收条件13.1(91)13.2交接验收*(93)附录A自动化仪表分项工程质量验收记录(94)附录B节流装置所要求的最短直管段长度.(99)本规范用词说明(100)引用标准名录-(101)附:条文说明
Contents1General provisions1)2Terms(2)3Basic requirement(5)3.1Technical preparation of construction(5)3.2Qualitycontrol(5)3.3 Division for acceptance of construction quality(5)3.4 Inspection quantity(6)3.5Acceptance method and quality qualified standard ..(7)4Inspection and keeping for instruments and materials ..... (10)4.1 Inspection and keeping for instruments and materials(10)4.2Qualityacceptance(11)5 Tapinstallation(13)5.1General requirement(13)5.2Temperature tap(13)5.3Pressuretap(14)5.4Flowtap(14)5.5Level tap(16)5.6Analysistap(17)5.7Quality acceptance(17)6Instrumentinstallation(22)6.1 General requirement(22)6.2Instrumentpanels,cabinets and cases(23)6.3Detecting and measuring instrument for temperature :(25):4
(25)-6.4 Detecting and measuring instrument for pressure(25)6.5Detecting and measuring instrument forflow(28)6.6 Detecting and measuring instrument for level6.7 Detecting and measuring instrument for mechanical(29)quantity6,8Detecting and measuring instrument for composition(30)analysis and properties of matter(30)Detecting and measuring instrument for others .6.9(30)6.10ActuatorControl instrument and comprehensive control system .... (31)6.11(31)6.12Power supply device of instrument(33)6.13Quality acceptance(40)7Installation of instrumentation line(40)7.1 General requirement(41)7.2 Manufacture and installation for supports(42)7.3Installationof cabletray(43)7.4Installation of cable conduit ..(44)7.5Laying of cable,electric wire and optical cable(46)7.6Distributing of instrumentation line(47)7.7Quality acceptance(52)8 Installation of instrumentation piping(52)General requirement8.1(53)8.2Measuringpiping(54)8.3Pneumatic signal piping(54)8.4Airpiping(55)8.5Hydraulic piping(56)Instrumentation piping in panels,cabinets and cases ..8.6(56)8.7Pipingtesting.5