Chapter 4 1)资金的时间价值time value of money 生产资料的消耗 剩余产品价值 转移价值 税金+利润 S=C+V+in 产品的价值 必要劳动所创造的价值 报酬+福利
Chapter 4 1) 资金的时间价值time value of money S = C + V + m 产品的价值 生产资料的消耗 ——转移价值 必要劳动所创造的价值 ——报酬+福利 剩余产品价值 ——税金+利润
Chapter 4 Time Value of Money S=C+V+m Capital Fund increases with time The total net value of all goods New value and services produced within a nation over a specified period of time,representing the sum of National income wages,profits,rents,interest,and 国民收入 pension payments to residents of the nation
Chapter 4 Time Value of Money S = C + V + m Capital / Fund increases with time New value Σ National income 国民收入 The total net value of all goods and services produced within a nation over a specified period of time, representing the sum of wages, profits, rents, interest, and pension payments to residents of the nation
Chapter 4 Engineering Example 兴建某一水利工程一资金需贷款(fund from loan) 协议:贷款金额、贷款利息、还贷期限 建设期内的利息一计入固定资产 工程投产后: 1)每年按固定资产的某一百分比提取基本折旧基金、 大修基金和其他费用一 实现简单再生产 2)从利润中了 部分偿还贷款的本息 另一部分扩大再生产
Chapter 4 Engineering Example 兴建某一水利工程 —— 资金需贷款(fund from loan) 协议:贷款金额、贷款利息、还贷期限 建设期内的利息——计入固定资产 1)每年按固定资产的某一百分比提取基本折旧基金、 大修基金和其他费用 —— 实现简单再生产 2)从利润中 工程投产后: 一部分偿还贷款的本息 另一部分扩大再生产
Chapter 4 Question 为什么过去工程上总是争项目,拖工期? 资本利润率>贷款利率>储蓄利率
Chapter 4 Question 为什么过去工程上总是争项目,拖工期 ? 资本利润率 > 贷款利率 > 储蓄利率
Chapter 4 2)资金流程图和计算基准年 投资、费用与收益方向相反! Uo tc(年) 1o012 6 B Bo 投产期 建设期 生产期 Fg.4.1 Fund flow chart资金流程图
Chapter 4 2) 资金流程图和计算基准年 Fig. 4.1 Fund flow chart 资金流程图 投资、费用与收益方向相反!