格式:MI1102R02 中国最社质星证公司 CHINA CLASSIFICATION SOCIETY CERTIFICATION COMPANY 副本 环境管理体系认证证书 COPY ENVIRONMENTAL MANAGEMENT SYSTEM CERTIFICATE 编号:No.00515E21317RIM 兹证明 中交天津港湾工程设计院有限公司 (注册地址:天津市开发区南海路11号A座12层邮编:300461) (经营地址1:天津港保税区跃进路航运服务中心8号楼10层邮编:300461) (经营地址2:山东省青岛市市南区福州南路16号中港大厦9楼邮编:266071) (经营地址3:辽宁省大连市中山区延安路9号12层邮编:116001) This is to certify that the Environmental Management System(EMS)of TIANJIN PORT ENGINEERING DESIGN CONSULTING COMPANY LTD OF CCCC FIRST HARBOR ENGINEERING COMPANY LTD (Registered Add: 12 FLOOR, SUITE A, No II NANHAI ROAD, TIANJIN ECONOMIC TECHNOLOGY AREA, TIANJIN, 300461, P R CHINA) (Operation Add 1: No 8 BUILDING, SHIPPING CENTER, YUEJIN ROAD, TIANJIN PORT FREE TRADE ZONE, 300461, P R CHINA) (Operation Add 2: ZHONGGANG MANSION 9TH FLOOR, FUZHOU SOUTH ROAD No. 16, OINGDAO CITY, SHANDONG PROVINCE, 266071, P.R. CHINA) (Operation Add 3: FLOOR 12, No 9 YANAN ROAD, ZHONGSHAN DISTRICT, DALIAN CITY, LIAONING PROVINCE, 116001, P.R. CHINA 建立的环境管理体系符合标准:GB/T24001-2004/ISO14001:2004。 has been found to conform to standard: GB/T 24001-2004/ ISO 14001: 2004 本证书对下述范围的环境管理体系有效:*水运行业工程设计;建筑工程设计;港口河海及建筑工 程编制项目建议书、编制项目可行性研究报告:港口河海规划咨询*。 This certificate is valid to the following scope for EMS:*DESIGN OF MARINE TRANSPORT ENGINEERING; DESIGN OF CONSTRUCTION ENGINEERING: PREPARATION OF PROJECT PROPOSAL FOR PORT, SEA, RIVER AND CONSTRUCTION ENGINEERING, PREPARATION OF PROJECT FEASIBILITY STUDY REPORT* 社质量认 本证书有效期至:2018年7月9日。 This certificate is valid until 9 July 2018 证书专用章 Seal for Certificate 换证日期:2057月3 IAF/CNAS Reissued on 3 Julr 2405 7oN孟品 总经理 EMS MANAGEMENT SYSTEM 一虎、一 CNAS CO05-E General Manager Huang Shiyuan 人均不应摘录或节选本证书的内容,有关各方对所持证书的真实性有疑问时,可以向我公词咨询,本证书信息可在国家认证认可监督管理委员会宫方网站(www,cma,gov,cn)上查询 ingrid thrush the otal weht od IsOnandaoCrechtationAttunistraionofthePeopin'sRepibocofChimatwww.aa.fow.cni. 中国船级社量认证公司北京市东黄域根南街40号10000电话:+s610)65219001网址: toDnHiangChrnGnNanJe.feuma.tomechAate.t+w106o7amWelstetwww.c.am
格式:M102R03 中国最社质星i证公司 副本 职业健康安全管理体系认证证coPy CHINA CLASSIFICATION SOCIETY CERTIFICATION COMPANY OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEM CERTIFICATE 编号:No.00515S21318RIM 兹证明 中交天津港湾工程设计院有限公司 (注册地址:天津市开发区南海路11号A座12层邮编:300461) (经营地址1:天津港保税区跃进路航运服务中心8号楼10层邮编:300461) (经营地址2:山东省青岛市市南区福州南路16号中港大厦9楼邮编:266071) (经营地址3:辽宁省大连市中山区延安路9号12层邮编:116001) This is to certify that the Occupational Health and Safety Management System(OHSMS)of TIANJIN PORT ENGINEERING dESIGN CONSULTING COMPANY LTD OF CCCC FIRST HARBOR ENGINEERING COMPANY LTD Registered Add: 12 FLOOR, SUITE A, No 11 NANHAI ROAD, TIANJIN ECONOMIC TECHNOLOGY AREA, TIANJIN, 300461, P R CHINA: Organizational Code: 10329215-7 (Operation Add 1: No 8 BUILDING, SHIPPING CENTER, YUEJIN ROAD, TIANJIN PORT FREE TRADE ZONE, 300461, P.R. CHINA) (Operation Add 2: ZHONGGANG MANSION 9TH FLOOR, FUZHOU SOUTH ROAD No. 16, OINGDAO CITY, SHANDONG PROVINCE, 266071, P.R. CHINAN (Operation Add 3: FLOOR 12, No 9 YANAN ROAD, ZHONGSHAN DISTRICT, DALIAN CITY LIAONING PROVINCE, 116001, P.R. CHINA) 建立的职业健康安全管理体系符合标准:GB/T28001-2011/ OHSAS18001:2007 has been found to conform to standard: GB/T 28001-2011/OHSASI8001: 2007 本证书对下述范围的职业健康安全管理体系有效:*水运行业工程设计;建筑工程设计;港口河海 及建筑工程编制项目建议书、编制项目可行性研究报告;港口河海规划咨询*。 This certificate is valid to the following scope for OHSMS:*DESIGN OF MARINE TRANSPORT ENGINEERING; DESIGN OF CONSTRUCTION ENGINEERING: PREPARATION OF PROJECT PROPOSAL FOR PORT, SEA, RIVER AND CONSTRUCTION ENGINEERING, PREPARATION OF PROJECT FEASIBILITY STUDY REPORT* 本证书有效期至:2018年7月9日。 级社质量认 This certificate is valid until 9 July 2018 证书专用章 Seal for Certificate 换证日期:205年7月3且 CNAS Reissued on 3Ju2015ETY CERTE 总经理: 一论-2 OHSMS MANAGEMENT SYSTEM CNAS C005-S General Manager Huang shiyuan 车证书根据中国船级社质量认证公司认证规范及有关程序规定签发,当本证书包括证书附件时,则附件必须与主证书同时使用。每一页证书(含附件)均须有本公司盖章方可生效,任何单位或个 人均不应录或节选本证书的内容,有关各方对所持证书的真实性有疑问时,可以向我公司咨询。本证书信息可在国家认证认可监督管理委员会官方网站 Cn)上查询 inre!throwntheoffalwebeneudceRtitoanonundAccreditationArmnimatimoftheteOpl'sRetiirofChaina(www.ara.gow.nl 中国船社量认延公司北京市东黄域根南街40号10000电话:4861065239001网址:www,ac,com a0DongHuanCheruGnNanJieBeure.tooe,ChiraTel,t+n10M02pa!Webate,www
東埔察金边新城工业园区起步区基础设施工程 工程可行性研究报告 目录 第1章总论 1.1项目位置 12项目概述 13设计内容 1222 14投资模式 15设计依据 第2章项目必要性 21项目背景 22本项目开发必要性 第3章发展分析… 3.1指导思想、性质和定位 32园区产业选择 3.3循环经济概念和规划. 34节能减排规划 3.5项目SWOT分析 第4章自然条件 4.1气候 42工程水文 43工程地质 第5章园区用地布局 5.1规划的金边新城区域现状 52金边新城总体用地布局… 53工业园区起步区用地布局 第6章土地整平 6.1陆域形成 62吹填工程量计算 第7章道路及软基处理工程 7.1道路工程 72道路软基处理工程 中交天津港湾工程设计院有限公司
柬埔寨金边新城工业园区起步区基础设施工程 工程可行性研究报告 中交天津港湾工程设计院有限公司 1 目 录 第 1 章 总论 ........................................................................................................................................... 1 1.1 项目位置 ....................................................................................................................................... 1 1.2 项目概述 ....................................................................................................................................... 2 1.3 设计内容 ....................................................................................................................................... 2 1.4 投资模式 ....................................................................................................................................... 2 1.5 设计依据 ....................................................................................................................................... 3 第 2 章 项目必要性 ................................................................................................................................. 5 2.1 项目背景 ....................................................................................................................................... 5 2.2 本项目开发必要性 ..................................................................................................................... 27 第 3 章 发展分析 ................................................................................................................................... 32 3.1 指导思想、性质和定位 ............................................................................................................. 32 3.2 园区产业选择 ............................................................................................................................. 34 3.3 循环经济概念和规划 ................................................................................................................. 37 3.4 节能减排规划 ............................................................................................................................. 40 3.5 项目 SWOT 分析 ........................................................................................................................ 44 第 4 章 自然条件 ................................................................................................................................... 47 4.1 气候 ............................................................................................................................................. 47 4.2 工程水文 ..................................................................................................................................... 48 4.3 工程地质 ..................................................................................................................................... 48 第 5 章 园区用地布局 ........................................................................................................................... 50 5.1 规划的金边新城区域现状 ......................................................................................................... 50 5.2 金边新城总体用地布局 ............................................................................................................. 55 5.3 工业园区起步区用地布局 ......................................................................................................... 58 第 6 章 土地整平 ................................................................................................................................... 62 6.1 陆域形成 ..................................................................................................................................... 62 6.2 吹填工程量计算 ......................................................................................................................... 63 第 7 章 道路及软基处理工程 ............................................................................................................... 65 7.1 道路工程 ..................................................................................................................................... 65 7.2 道路软基处理工程 ..................................................................................................................... 68
東埔寨金边新城工业园区起步区基础设施工程 程可行性研究报告 第8章市政管网工程 81给水工程规划 82排水工程规划 83电力工程规划 84通信工程规划 85燃气工程规划… 86管线综合 第9章环境保护规划… 9.1规划原则 92环境污染治理与保护 93规划实施措施 .81 第10章综合防灾工程… 101消防工程… 102防洪工程 103防震减灾 83 第11章项目基础设施佔算及资金筹措 11.1基础设施匡算 12资金筹措 第12章经济效益分析… 12.1项目开发建设及经营组织实施计划 122项目建设投资与经营成本 12、3项目销售收入估算 24税金估算 125项目财务评价 126结论 第13章项目结论及建议… 13.1项目结论 132建议 中交天津港湾工程设计院有限公司
柬埔寨金边新城工业园区起步区基础设施工程 工程可行性研究报告 中交天津港湾工程设计院有限公司 2 第 8 章 市政管网工程 ........................................................................................................................... 70 8.1 给水工程规划 ............................................................................................................................. 70 8.2 排水工程规划 ............................................................................................................................. 72 8.3 电力工程规划 ............................................................................................................................. 74 8.4 通信工程规划 ............................................................................................................................. 75 8.5 燃气工程规划 ............................................................................................................................. 76 8.6 管线综合 ..................................................................................................................................... 77 第 9 章 环境保护规划 ........................................................................................................................... 79 9.1 规划原则 ..................................................................................................................................... 79 9.2 环境污染治理与保护 ................................................................................................................. 79 9.3 规划实施措施 ............................................................................................................................. 81 第 10 章 综合防灾工程 ......................................................................................................................... 82 10.1 消防工程 ................................................................................................................................... 82 10.2 防洪工程 ................................................................................................................................... 82 10.3 防震减灾 ................................................................................................................................... 83 第 11 章 项目基础设施估算及资金筹措 ............................................................................................. 84 11.1 基础设施匡算 ........................................................................................................................... 84 11.2 资金筹措 ................................................................................................................................... 84 第 12 章 经济效益分析 ......................................................................................................................... 85 12.1 项目开发建设及经营组织实施计划 ....................................................................................... 85 12.2 项目建设投资与经营成本 ....................................................................................................... 85 12.3 项目销售收入估算 ................................................................................................................... 85 12.4 税金估算 ................................................................................................................................... 86 12.5 项目财务评价 ........................................................................................................................... 86 12.6 结论 ........................................................................................................................................... 86 第 13 章 项目结论及建议 ..................................................................................................................... 89 13.1 项目结论 ................................................................................................................................... 89 13.2 建议 ........................................................................................................................................... 90
東埔寨金边新城工业园区起步区基础设施工程 工程可行性研究报告 第1章总论 11项目位置 柬埔寨王国位于东南亚中南半岛南部,东部和东南部同越南接壤, 北部与老挝交界,西部和西北部与泰国毗邻,西南濒临泰国湾。国土面 积18.1035万km2,海岸线长460km,中部和南部是平原,东部、北部和 西部被山体、髙原环绕,大部分地区被森林覆盖。湄公河在境內长约 500km,流贯东部。 本项目位于规划中柬埔寨金边新城东侧工业园区南部,金边新城位 于柬埔寨金边市湄公河以东,与金边老城区隔河相望,行政划分横跨两 省一市(干拉省、波棉省和金边市),主要分布于规划区域沿湄公河堤 岸39km纵深km范围内,规划金边新城总面积约为33km2。规划工业 园区位于金边新城东侧。本工程为工业园区的起步区基础设施工程,位 于工业园区的东南角,起步区规划面积为6km2。 工业园区 ?总体规划 善 明位置 边老城 图1-1工程位置图 中交天津港湾工程设计院有限公司
柬埔寨金边新城工业园区起步区基础设施工程 工程可行性研究报告 中交天津港湾工程设计院有限公司 1 第1章 总论 1.1 项目位置 柬埔寨王国位于东南亚中南半岛南部,东部和东南部同越南接壤, 北部与老挝交界,西部和西北部与泰国毗邻,西南濒临泰国湾。国土面 积 18.1035 万 km2 ,海岸线长 460km,中部和南部是平原,东部、北部和 西部被山体、高原环绕,大部分地区被森林覆盖。湄公河在境内长约 500km,流贯东部。 本项目位于规划中柬埔寨金边新城东侧工业园区南部,金边新城位 于柬埔寨金边市湄公河以东,与金边老城区隔河相望,行政划分横跨两 省一市(干拉省、波棉省和金边市),主要分布于规划区域沿湄公河堤 岸 39km 纵深 1km 范围内,规划金边新城总面积约为 333km2 。规划工业 园区位于金边新城东侧。本工程为工业园区的起步区基础设施工程,位 于工业园区的东南角,起步区规划面积为 6km 2。 图 1-1 工程位置图