"Tenth five-year"plan (2001-2005) Focus on water resource management,Ground water and wastewater treatment. city level wastewater treatment facility.Every city need to build wastewater treatment facilities.Sewage treatment rate should be higher than 45%by 2005. Enhance management on air pollution control Focus on SO,emission reduction. Start MSW environmental sound management and HW central treatment. Promote cleaner production.Minimize waste from industry.Close heavy polluted industry or plants. ·Charge MSW fee
"Tenth five‐year" plan (2001‐2005) • Focus on water resource management, Ground water and wastewater treatment. • city level wastewater treatment facility. Every city need to build wastewater treatment facilities. Sewage treatment rate should be higher than 45% by 2005. • Enhance management on air pollution control . Focus on SO2 emission reduction. • Start MSW environmental sound management and HW central treatment. • Promote cleaner production. Minimize waste from industry. Close heavy polluted industry or plants. • Charge MSW fee
Eleventh five-year plan on Waste management(2006-2010) Special paragraph on pollution control from waste strategy is minimization,recycling and environmental sound management.Waste pollution control is the key area for environmental protection. 1.HW and medical waste detoxification implement HW and Medical waste facility planning. Implement and polish the management strategy. Establish integrated management and monitoring system. Basiclly meet the requirement on safety disposal. Complete the project on chromium slag disposal
Eleventh five‐year plan on Waste management (2006‐2010) • Special paragraph on pollution control from waste strategy is minimization, recycling and environmental sound management. Waste pollution control is the key area for environmental protection . 1.HW and medical waste detoxification implement HW and Medical waste facility planning. • Implement and polish the management strategy. • Establish integrated management and monitoring system. • Basiclly meet the requirement on safety disposal. • Complete the project on chromium slag disposal
Waste management hierarchy prevention Integrated management Reduce Reuse/recycle Treatment Disposal
Waste management hierarchy prevention Reduce Reuse/recycle Treatment Disposal priority Environmental Sustainability Economic affordability Social Acceptance Integrated management
Eleventh five-year plan on Waste mangement 2.Environmental sound management on MSW. Implement facility planning.Newly increase capacity 240 thousand tonnes/d,rate on environmental sound management should be higher than 60%.Implement sorting collection.Pay attention on leachate treatment.Gradually rehabilitate the dumping site. 3.promote recycling especially coal fly ash,industrial waste from metallurgy, chemical industry and mining waste.By 2010,recycling rate of industrial waste reach 60%.Promote recycling of C&D waste, waste from feedlots and stalks.Establish the extended producer responsibility.Enhance recycling system.Control and monitoring imported waste recycling companies to avoid the secondary pollution
Eleventh five‐year plan on Waste mangement • 2. Environmental sound management on MSW。 Implement facility planning. Newly increase capacity 240 thousand tonnes/d,rate on environmental sound management should be higher than 60%. Implement sorting collection. Pay attention on leachate treatment. Gradually rehabilitate the dumping site . • 3. promote recycling especially coal fly ash, industrial waste from metallurgy, chemical industry and mining waste. By 2010, recycling rate of industrial waste reach 60%. Promote recycling of C&D waste, waste from feedlots and stalks . Establish the extended producer responsibility. Enhance recycling system. Control and monitoring imported waste recycling companies to avoid the secondary pollution
Key projects in “eleventh-five year”plan HW and medical waste:complete 31 provincial level HW treatment center 300 city level medical waste center. Cr-slag treatment projects MSW projects:newly established capacity 240 thousand tonnes/d. Key area for investment 240 thousand tonnes/d MSW facilities Industrial waste and e-waste treatment facility
Key projects in “eleventh‐five year”plan • HW and medical waste:complete 31 provincial level HW treatment center 、300 city level medical waste center. Cr‐slag treatment projects MSW projects:newly established capacity 240 thousand tonnes/d. • Key area for investment 240 thousand tonnes/d MSW facilities • Industrial waste and e‐waste treatment facility