2.Open Excavation Koden Utrasonic Probe 百年同海22 TONGILUNIVERSITY
22 Koden Utrasonic Probe 2. Open Excavation
2.Open Excavation Koden Section mvb LONDON LEE TUNNEL-OVERFLOW SHAFT-KODEN SECTION @80m From Guide Wall SECONDARY LEGEND KODEN READING 13 THEORITICAL SEco 12 4R 11 10 TOLERANCE MARY SECONDARY 0,3% 百年同濟23 TONGIUNIVERSΠTY
23 Koden Section 2. Open Excavation
2.Open Excavation Cages;Prefab and Lift 百年同海24 TONGILUNIVERSITY
24 cages; Prefab and Lift 2. Open Excavation
2.Open Excavation Cage Ready for Installation 百年同濟25
25 Cage Ready for Installation 2. Open Excavation
2.Open Excavation Cage Installation 百年同濟26 TONGILUNIVERSITY
26 Cage Installation 2. Open Excavation