1.Introduction 6'97 Stone crusher (diameter:1,20 m) 百年同海7 TONGII UNIVERSITY
7 Stone crusher (diameter: 1,20 m) 1. Introduction
1.Introduction Sandboden in Fontainebleau Plastische Tonboden Sandy ground in fontainebleau Plastic clay ■mesne in cham28 ■Ma ne 口 Sandboden in Beauchamp Falsche Letten Massenkalkstein Sandboden in Auteuil Sandy ground in beauchamp False poller's clay mass limestone Sandy ground in auteuil ☐Mergel inMeudon marl in meudon Kalkstein und grune Tonboden Supragipsmergel Limestone and green clay Supra gypsum marl Open Mode EPB Slurry EPB Geology Paris 百年同濟 8 TONGILUNIVERSITY
8 Open Mode EPB Slurry EPB Geology Paris 1. Introduction
1.Introduction Foreign Objects inside the Ground F4T内阿
9 9 /40 Foreign Objects inside the Ground 1. Introduction
1.Introduction No construction project is risk free. Risk can be managed,minimised, shared,transferred or accepted. It cannot be ignored.” Sir Michael Latham,1994 百年同濟10 TONGILUNIVERSITY
10 28.04.2014 “No construction project is risk free. Risk can be managed, minimised, shared, transferred or accepted. It cannot be ignored.” Sir Michael Latham, 1994 1. Introduction
1.Introduction Tunnelling is not Risky But we have to get the balance right 百年问濟11 TONGII UNIVERSITY
11 Tunnelling is not Risky But we have to get the balance right! 1. Introduction