Chapter 7. Guidelines for laboratory and facility commissioning试运转
Chapter 7. Guidelines for laboratory and facility commissioning试运转
U Laboratory/facility commissioning may be defined as the systematic review and documentation process signifying that specified laboratory structural components, systems and/or system components have been installed, inspected, functionally tested and verified to meet national or international standards, as appropriate
❑Laboratory/facility commissioning may be defined as the systematic review and documentation process signifying that specified laboratory structural components, systems and/or system components have been installed, inspected, functionally tested and verified to meet national or international standards, as appropriate
UThe respective building systems design criteria and design function esta blish these requirements In other words, laboratories designated as Biosafety levels 1-4 will have different and increasingly complex commissioning requirements Geographical and climatic conditions, such as geological fault lines地质断层带 or extreme heat,cold or humidity may also affect the laboratory design and therefore the commissioning requirements
❑The respective building system’s design criteria and design function establish these requirements. In other words, laboratories designated as Biosafety Levels 1–4 will have different and increasingly complex commissioning requirements. Geographical and climatic conditions, such as geological fault lines地质断层带 or extreme heat, cold or humidity may also affect the laboratory design and therefore the commissioning requirements
aUpon the completion of the commissioning process; the pertinent有关的 structural components and support systems will have been subjected to the various operating conditions and failure modes that can be reasonably expected, and will have been approved. u The commissioning process and acceptance criteria should be established early, preferably during the programming phase of the construction or renovation project
❑Upon the completion of the commissioning process, the pertinent有关的 structural components and support systems will have been subjected to the various operating conditions and failure modes that can be reasonably expected, and will have been approved. ❑The commissioning process and acceptance criteria should be established early, preferably during the programming phase of the construction or renovation project
a By acknowledging the commissioning process early in the project, architects, engineers, safety and health personnel and ultimately the laboratory occupants understand the performance requirements of the specific la boratory and set uniform expectations for laboratory and/or facility performance
❑By acknowledging the commissioning process early in the project, architects, engineers, safety and health personnel and ultimately the laboratory occupants understand the performance requirements of the specific laboratory and set uniform expectations for laboratory and/or facility performance