Table 5. 1 Some large hydroelectric Projects in the U.S First Year Rated Capacity Project River of Operation (MW) Grand Coulee Columbia 1942 7100 John Day Columbia 1969 2500 Chief Joseph Columbia 1955 2300 Moses-Niagara St Lawrence 1961 Bath County, va Buck Creek 1985 2100 Hoover Colorado 1936 2080 The Dalles Columbia 1957 Racoon Mt tennessee 1979 1530 Glen Canyon Colorado 1964 130 MeNary, OR Columbia 1954 1130 Northfield, MA 1971 1080 Sources: U.S. Energy Information Administration(2000): United States Bureau of Reclamation (2004) 复旦大学环境科学与工程系 Department of Environmental Science and Engineering, Fudan University
Table 5.1 Some Large Hydroelectric Projects in the U.S
4.0 30 0% Ea至359工 20 b一 1960 1980 1990 2000 2010 Figure 5.4 Electric energy from hydroelectric installations in the United States(solid line) The percentage of U. S electricity provided by hydropower is shown as the dashed line Source: Data for 1950 to 1990 from Annual Energy review, 1990; data for 1991 to 2003 from U.S. Energy Information Administration) 复旦大学环境科学与工程系 Department of Environmental Science and Engineering, Fudan University
Figure 5.4 Electric energy from hydroelectric installations in the United States (solid line). The percentage of U.S. electricity provided by hydropower is shown as the dashed line. (Source: Data for 1950 to 1990 from Annual Energy Review, 1990; data for 1991 to 2003 from U.S. Energy Information Administration)