Pre-bunkering checking check list Check that all bunker tank air pipes are open and unblocked Ensure that all sounding pipe caps are tight, except when sounding tank. Reconfirm space remaining in all bunker tanks to be filled Fire extinguishers(powder and fire loses)to be prepared ready at the manifold
Pre-bunkering checking check list • Check that all bunker tank air pipes are open and unblocked. • Ensure that all sounding pipe caps are tight, except when sounding tank. • Reconfirm space remaining in all bunker tanks to be filled. • Fire extinguishers (powder and fire hoses) to be prepared ready at the manifold
Pre-bunkering checking check list \. Ensure that bunker hose is correctly and safely connected →· Ensure that all unused bunker manifolds on booth sides of the vessel are secured and blanked tightly with bolts in every flange hole. The required bunker specifications must be obtained Both the officer in charge and the assisting crew must be familiar with the piping and valve line up
Pre-bunkering checking check list • Ensure that bunker hose is correctly and safely connected. • Ensure that all unused bunker manifolds on booth sides of the vessel are secured and blanked tightly with bolts in every flange hole. • The required bunker specifications must be obtained. • Both the officer in charge and the assisting crew must be familiar with the piping and valve line up
Pre-bun kering checking check list The procedures for Emergency Shutdown, Topping Tanks and Draining of lines and hoses to be agreed upon Inspect hose and couplings for damages. Discuss bunkering plan with supplier Discuss vessel's emergency response procedures with supplier
Pre-bunkering checking check list • The procedures for Emergency Shutdown, Topping Tanks and Draining of lines and hoses to be agreed upon. • Inspect hose and couplings for damages. • Discuss bunkering plan with supplier • Discuss vessel’s emergency response procedures with supplier
Pre-bunkering checking check list Discuss suppliers own emergency response procedure. Establish signaling system with supplier. Commence pumping -Reduce pumping rate- Cease pumping -Emergency stop Agree maximum pumping rate and pressure. Sampling prepared. Prepare filling line and open all relevant Ines
Pre-bunkering checking check list • Discuss supplier’s own emergency response procedure. • Establish signaling system with supplier. Commence pumping – Reduce pumping rate – Cease pumping – Emergency stop. • Agree maximum pumping rate and pressure. • Sampling prepared. • Prepare filling line and open all relevant lines