Power Market Deregulation Vertically Integrated Utilities Generation IPP IPP Character: separated plant Transmission Tie Line Tie Line and network; bidding to connect IPP Distribution IPP to the network The introduction of power market brings competition, Genco Genco Genco in the mean while, Tie Line Tie Line brings risk to Transco power system Genco Genco Genco Genco 电力桑镜广城测量名控制四可省重点实验蜜 家电网
电力系统广域测量与控制四川省重点实验室 Power Market Deregulation The introduction of power market brings competition, in the mean while, brings risk to power system Generation Transmission Distribution IPP IPP IPP IPP Vertically Integrated Utilities Tie Line Tie Line Transco Genco Genco Genco Genco Genco Genco Genco Tie Line Tie Line Character: separated plant and network; bidding to connect to the network
Summary The scale of power grid grows rapidly,and the power grid becomes more and more complex The characteristics of generation load becomes more and more complex The introduction of power market further makes the operation and control of power system complex China has super large scale power network, which is one of the largest in the world. 电力镜广城测量乌控制四川省重点实验蜜 国家电网
电力系统广域测量与控制四川省重点实验室 Summary The scale of power grid grows rapidly, and the power grid becomes more and more complex The characteristics of generation load becomes more and more complex The introduction of power market further makes the operation and control of power system complex China has super large scale power network, which is one of the largest in the world
2003 New York Blackout New York City, 003/4577844 Albany,Buffalo in New York, Cleveland and Columbus in Ohio, and Detroit.Ottawa and Toronto in Canada were affected Lost 50 Billion dollar ISAT Geostar 45 23:15EST14Aug.2003 电力拿镜广城洲量写控制四川省重点实验蜜 家电
电力系统广域测量与控制四川省重点实验室 2003 New York Blackout New York City, Albany, Buffalo in New York, Cleveland and Columbus in Ohio, and Detroit. Ottawa and Toronto in Canada were affected Lost 50 Billion dollar
Introduction to Power System Operation
Introduction to Power System Operation