法国BURE地下实验室 SURFACE FACILITIES MAIN SHAFT AUXILIARY SHAFT EXPERIMENTAL NICHE UNDERGROUND FACILITIES UPWARD CROSS-CUT DOWNWARD CROSS-CUT TECHNIC GALLERY EXPERIMENTAL GALLERY 03-0332/D
法国 BURE 地下实验室
气体迁移试验 Shear Zone VE Tunnel Concrete Plug BackFilling Access Tunnel Sand/Bentonite Gas Vent Concrete Sild ED☑ Sand laye Total Grid Number:374,528 analytic model building the concrete silo Dissolved gas change during gas migration measurement system data-set
Sand layer Sand/Bentonite Gas Vent Concrete Silo BackFilling Access Tunnel VE Tunnel Concrete Plug EDZ Shear Zone Total Grid Number:374,528 building the concrete silo measurement system & data-set analytic model 气体迁移试验 Dissolved gas change during gas migration
膨润土封填实验 Bentonite blocks FEBEX- Experiment in Grimsel URL PLUG BENTONITE HEATER 1. UNER HFA正R2 (ENRESA. ONAND CONTROL SYSTEM 2001) DI LEI F1 MIN G 222 454m 2细m 270m 17.40m
FEBEX - Experiment in Grimsel URL 膨润土封填实验 (ENRESA, 2001)
研究背景 北山 高庙子 包头 呼和浩特 石家 地 质图 北 野马泉 yema quan 日并Jiujing 向阳山一新场
北山 高庙子 研究背景
研究背景 国际乏燃料安全和放射性废物安全公约 美国开始研究 1957 “核废物法” (1982) 尤卡山:场址 2002 建成 2018
国际乏燃料安全和放射性废物安全公约 美国开始研究 1957 “核废物法” (1982) 尤卡山:场址 2002 建成 2018 研究背景