1、组织中的团队类型 2、组织中的人 3、正式组织 4、非正式组织 5、组织决策
文件格式: PPT大小: 708KB页数: 34
1、主要的经济问题 2、收入流量循环 3、企业的经济目标 4、劳动力、工资及失业 5、通货膨胀 6、经济增长
文件格式: PPT大小: 591KB页数: 35
上海交通大学:《应用统计学(B类)》教学资源_Class Notes_Class Notes Week One
文件格式: PPT大小: 147.5KB页数: 24
Items to be considered when estimating cost Preparing a baseline budget Cumulating actual costs Determining the earned value of work performed Analyzing cost performance Forecasting project cost at completion Controlling project costs Managing cash flow
文件格式: PPTX大小: 357.4KB页数: 21
Taking resource constraints into account when developing a network diagram Determining the planned resource utilization for a project Leveling the use of resources within the required time frame of the project Determining the shortest project schedule with the limited resources availabe
文件格式: PPTX大小: 308.06KB页数: 16
Performing the steps in the project control process Determining the effects of actual schedule performance on the project schedule Incorporating project changes into the schedule Calculating an updated project schedule Controlling the project schedule
文件格式: PPTX大小: 315.14KB页数: 20
Estimating the duration for each activity Establishing the estimated start time and required completion time for the overall project Calculating the earliest times at which each activity can start and finish, based on the project’s estimated start time Calculating the latest times by which each activity must start and finish in order to complete the project by its required completion time Determining the amount of positive or negative slack between the time each activity can start or finish and the time it must start or finish Identifying the critical (longest) path of activities
文件格式: PPTX大小: 325.45KB页数: 27
Clearly defining the project objective Developing a work breakdown structure Developing a network diagram Utilizing a project management methodology called the systems development life cycle for information systems development projects
文件格式: PPTX大小: 2.16MB页数: 38
Elements involved in establishing a project plan Identifying and assessing risks Steps in the project control process Actions to be taken when a project is terminated
文件格式: PPTX大小: 342.42KB页数: 24