Ability to control cos/ Design Changes Cost of Litigation Phase Design DD CDs Construction Time
Litigation Phase Effort Time Design DD CDs Construction
Case study:The Olympia Stadium Schematic Design 332x296m
Case study: The Olympia Stadium Schematic Design 332x296m
Case study:The Olympia Stadium Final Design:saving 400 million RMB
Case study: The Olympia Stadium Final Design: saving 400 million RMB
F 48 Portal Frames+0460 Steel
48 Portal Frames +Q460 Steel
从整体着眼,从局部着手! 功能一形态一结构 (没有唯一解) 技术+艺术+可持续发展
从整体着眼,从局部着手! 功能 形态 结构 (没有唯一解) 技术 + 艺术 + 可持续发展